Riley Construction

Stairs and railings, Grunau Metals, Specialty metal fabrication at Edward Bain School of Language and Art

Grunau Location: Wisconsin Office

Owner: Kenosha Unified School District #1

Contractor: Riley Construction

Architect: Bray Associates Architects

Engineer: Ambrose Engineering, Inc.

Case Study: Riley Construction Case Study

Testimonial: "Grunau Metals did a great job. They made sure we had permanent stairs as soon as the second floor was erected - the way it should be done." Tom Riley, President - Riley Construction

Completed: March 2004

Photo Courtesy of Riley Construction