Catoca Diamond Mine ~ Angola, Africa

Grunau's Orlando, FL fire protection shop fabricated an aqueous film-forming (AFFF) system to protect the Catoca diamond mine in Angola, Africa. The system was designed by Grunau without seeing the physical site and once approved and fabricated, the system's individual components were shipped to Africa. Paskor Holdings in Orlando (a Grunau client) assumed responsibility for constructing the fire protection system at the African mine.

Grunau Location: Florida Office

Completed: November 2008

This fire pump was assembled in Orlando to photograph for the on-site installation team, then separate components were shipped to the diamond mine
These existing mine refilling stations were rebuilt and protected with Grunau's overhead water-foam system